2025 Pavement Management Program
Each year the City of Leavenworth budgets funding for major street repairs, referred to as our Pavement Management Program (PMP). This is in addition to the regular annual maintenance of crack sealing, pothole repair, and street patching done by the Streets Division staff throughout the year.
This year’s PMP consists of a 2” full width mill and a 2” asphalt overlay on the streets listed below, including one City parking lot. In addition, the following improvements were made: curb & gutter repair, sidewalk repair, ADA ramps, concrete “diamonds” at manholes with new ring & lid, and pavement markings. The streets selected were based on the design engineer’s recommendation, pavement condition index (PCI), and City staff observations. This year the City is using another method of surface treatment called Ultra-Thin Bonded Asphaltic Surface (UBAS). This will be performed on Eisenhower Road from Progress to West of 4th Street.
Project Number: City of Leavenworth: 2024-010
Design Firm: Benesch
Construction Contract: McAnany Construction
Project Start Date: March 31, 2025
Project Completion Date: TBD (90 Calendar Days)
Project Costs:
- Design = $89,800 (Proposed)
- Construction = $1,384,543.27 (Bid)
The program includes residential, collector, and arterial streets across the City. Keeping and maintaining streets in good condition is a struggle due to weather, pavement age, truck traffic, and other factors. Streets in fair condition can have their useful life prolonged with these types of improvements. Streets in poor condition require long-term planning for reconstruction. The City of Leavenworth attempts to spread the available funds to all types of streets while still maximizing the funds for the most improvements.
The City appreciates the diligence of the contractor and their sub-contractors to remain on schedule when performing the needed improvements. The cooperation of local businesses and residents is very appreciated as well. The following lists the streets and parking lots in this year’s PMP.
2025 PMP – Mill & Overlay List of Streets
No. / Street Name / Location Description
1. 10th Avenue - Stockton to Spruce
2. 10th Avenue - Muncie to Gatewood
3. Limit Street - West Side of 20th to East Side of 20th
4. Limit Street - 15th to 14th
5. Limit Street - Shrine Park, East to Concrete Portion
6. Trailhead Lane - Limit to Montana
7. Montana Court - 4th to Trailhead
8. Idaho Street - 4th to Frontage
9. Frontage Road - 4th to McDonald’s Parking Lot
10. 10th Street - Spruce to Sherman
11. 10th Street - Cherokee to Shawnee
12. Cody Park Parking Lot - West Lot
Ultra-Thin Bonded Asphaltic Surface (UBAS):
1. Eisenhower Road - Progress to West of 4th Street
Alternates:
1. 5th & Cherokee Parking Lot - 431 Cherokee
2. 5th Avenue - Thornton to Doniphan
3. Ottawa Street - 20th to 17th
Additional Note:
The City as part of the 2025 PMP will be assisting the Parks Department with two Mill & Overlay projects.
- The Drive Entrance/Path at Wollman Park
- The Parking Lot behind the Riverfront Community Center
2025 PMP – Granite Seal
In addition to the Mill & Overlay Project, the City is continuing the use of Granite Seal for surface preservation. Streets will be swept then the Granite Seal will be placed. Additional sweeping at various intervals will follow to aid in removing loose material. Some of the streets will include new pavement markings. See below for a list of the streets in this year’s Granite Seal Project. As always the City appreciates the resident’s cooperation in this process.
Project Number: City of Leavenworth: 2024-010
Design Firm: Benesch
Construction Contract: Vance Brothers
Project Start Date: TBD
Project Completion Date: TBD (60 Calendar Days)
Project Costs:
- Design = (Included in the Mill & Overlay)
- Construction = $470,903.14 (Bid)
2025 PMP – Granite Seal List of Streets
No. / Street Name / Location Description
1. 20th Street - Dakota to Metropolitan
2. Ottawa Street – N. 17th to N. 13th
3. 6th Street – Spruce to Olive
4. 6th Street – Olive to Walnut
5. 2nd Street – South of Olive to Chestnut
6. 2nd Avenue – Thornton to Congress
7. 7th Street – Doniphan to Pees
8. 3rd Avenue – South of Santa Fe to Santa Fe
9. 3rd Avenue – Santa Fe to Evergreen
10. New Lawrence Road – Gatewood to Limit
11. Tanglewood Street – New Lawrence to Tanglewood Cul-de-sac
12. Winchester Drive – Candlewood to Winchester Cul-de-sac
13. Winchester Drive – Candlewood to North of Remington
14. Remington Lane – Winchester to Candlewood
15. Virginia Circle – Limit to Goddard Circle
16. Goddard Circle – Shrine Park to Virginia Circle
17. Lawrence Avenue – Ohio to Kansas
18. Limit Street – 20th to 15th
19. Limit Street – East of Bridge to 4th
Additional Note:
No Alternates will be done this year.
2025 PMP – Granite Seal
In addition to the Mill & Overlay Project, the City is continuing the use of Granite Seal for surface preservation. Streets will be swept then the Granite Seal will be placed. Additional sweeping at various intervals will follow to aid in removing loose material. Some of the streets will include new pavement markings. See below for a list of the streets in this year’s Granite Seal Project. As always the City appreciates the resident’s cooperation in this process.
Project Number: City of Leavenworth: 2024-010
Design Firm: Benesch
Construction Contract: Vance Brothers
Project Start Date: TBD
Project Completion Date: TBD (60 Calendar Days)
Project Costs:
- Design = (Included in the Mill & Overlay)
- Construction = $470,903.14 (Bid)
2025 PMP – Granite Seal List of Streets
No. / Street Name / Location Description
1. 20th Street – Dakota to Metropolitan
2. Ottawa Street – N. 17th to N. 13th
3. 6th Street – Spruce to Olive
4. 6th Street – Olive to Walnut
5. 2nd Street – South of Olive to Chestnut
6. 2nd Avenue – Thornton to Congress
7. 7th Street – Doniphan to Rees
8. 3rd Avenue – South of Santa Fe to Santa Fe
9. 3rd Avenue – Santa Fe to Evergreen
10. New Lawrence Road – Gatewood to Limit
11. Tanglewood Street – New Lawrence to Tanglewood Cul-de-sac
12. Winchester Drive – Candlewood to Winchester Cul-de-sac
13. Winchester Drive – Candlewood to North of Remington
14. Remington Lane – Winchester to Candlewood
15. Virginia Circle – Limit to Goddard Circle
16. Goddard Circle – Shrine Park to Virginia Circle
17. Lawrence Avenue – Ohio to Kansas
18. Limit Street – 20th to 15th
19. Limit Street – East of Bridge to 4th
Additional Note:
No Alternates will be done this year.