2020 Stormwater Project
2020 Stormwater Project
Project Number:
Description of Work:
Site # 1 - 746 Spruce St., Church Alley:
Remove & Replace large diameter corrugated metal pipe that has rusted completely through on the bottom side of the pipe. Will make a new connection to the existing arch at the west end on this project. The alley and street will then be repaired.
Site # 2 - 715 6th Avenue:
Remove & Replace large diameter corrugated metal pipe that has rusted completely through on the bottom side of the pipe. Will install a Junction Box to attach to the arch. Then realign the pipe run to the north to outflow into the ditch. The alley, street, and yard will be repaired. Rip Rap will be installed at the outflow.
Construction Contract: Pruett Construction
Start Date: Early August 2020
Completion Date: November 30, 2020
Project Cost: $146,033.20